Structural Solutions Specialists Remedial Ties - Crack Stitching & Reinforcement Wires  
  Crack Stitching - Re Pointing - Brick Reinforcement Remedial Wall Ties for Masonry
Home | Helical History | Availability  
CONTACT THOR HELICAL
Address:
2 Mayfair Court
Chirnside Park, Vic 3116
 
Phone: +61 (03) 9727 5468
Fax: +61 (03) 9726 4976
Mobile: 0414 297 899
Email:
 
 
 

REMEDIAL WALL TIES FOR LATERAL RESTRAINT - ( Timber Floor & Roof )

Thor Helical 9mm Diaphragm Tie Specification

Thor Helical 9.00mm nominal O.D, 316 grade stainless steel, helically roll - formed wire having a characteristic cross-sectional area of 14.88mm², and a pitch accuracy variation of no more than 0.5% from any given probate pitch along the axis, impact driven through pre-drilled, pre-determined sized pilot holes in the perimeter masonry and through into the second parallel framing timber, or, an embedment depth not less than 75mm into the timber framing end grain at intervals determined by a qualified structural engineer.

METHOD STATEMENT

Diaphragm Tie Spacing – Must be determined by a Consulting Structural Engineer - (Nominal 600mm horizontal spacing).

1.

Drill pilot holes through masonry to penetrate two parallel floor or ceiling joists, or a minimum of 75mm into timber end grain using, initially, a masonry drill size 6 – 7.5mm, followed by a similar sized wood bit if available.

N.B. To assist in accurate tracking across cavities allow the drill to STOP rotating prior to contacting and drilling each leaf. CAUTION – THE TIE MUST VISIBLY ROTATE AT A CONSISTENT RATE WHILST PENETRATING. The pilot hole diameter is critical, too small and the tie may bend rather than penetrate, too large and the tie will ream out the drilled hole in the masonry as it penetrates and will not be seen to rotate.

2.

Drill clearance hole to masonry for installation of Test Key if required.

3.

Drive in 9mm Thor Helical Drive Fix tie using telescopic SDS support tool & recess below brick face.

4.

Make good with clear silicon and brick dust from drilling.

CAUTION - ENSURE FLOOR/CEILING VOIDS ARE FREE OF SERVICES.

Where Thor bed-joint reinforcements are also being installed they must be in the mortar joint directly above or below the Thor Diaphragm Ties.


Download PDF Brochure: THOR Remedial Diaphragm Ties


Cavity Walls Solid Walls
Cavity Walls Solid Walls

Bay Windows
Bay Windows
Bays Windows
(Graphic for Illustrative Purposes Only)

Stairwell Application
Stairwell Application


Back to Top
 
Home  |  Helical History  |  Availability  |  Materials  |  THOR Helical Design  |  Wall Ties  |  THOR Ties Tester  |  Lintel Calculator
Copyright © Thor Helical Australia 2007
Website By: GM Web Designs